Resources
Explore our collection of HIV resources, toolkits and materials.
WHAI Original Resources
Bill C-12, Gender & HIV
Searching
Safety Planning: Stay Prepared, Stay Supported, Stay Safer
Safety planning is not new for those who work in the field of harm reduction, it’s built into the daily conversations and work you do. These pages on safety planning simply put the work you do every day into a structured format. We hope they help with onboarding or training new staff and strengthen the many ways you support individuals and your communities.
Download Guide
OHESI: HIV diagnoses in Ontario – 2023
This 2023 report examines data that informs progress on targets and help us understand which populations are experiencing a disproportionate burden of HIV risk and infection.
Download Report
Webinar Recording: Strengthening Access to HIV Prevention Medications for Women and Gender-Diverse People
Watch Webinar
The Positive Effect
Actively connecting and working together, we're a Canada-wide network of leaders, organizations, communities and people committed to the health and well-being of people living with HIV. Our priority is to reach the undiagnosed, and ultimately link people living with HIV to the care they need to live long and healthy lives, and to truly thrive!
Visit Website
Working with African, Caribbean & Black and Newly Migrated Communities who use Substances: Strategies to Strengthen the Work
Download Tip Sheet
The Closure of Supervised Consumption Sites: A Gender Analysis
A report on how the closures of SCS have had devastating impacts on women and gender-diverse people. This resource seeks to bring a gendered lens to our understanding of the impacts of the Community Care and Recovery Act by outlining 5 key considerations and laying the groundwork for strategies to address these impacts. French translation coming soon.
Download Report
Bill C-12, Gender & HIV
This report briefly outlines the key changes that Bill C-12: Strengthening Canada's Immigration Systems and Borders Act will have on immigration and asylum system. Then, through a gendered lens, we will further discusses the impacts these changes will have on HIV and healthcare, gender-based violence, housing insecurity, sex work, and drug policy, and share examples of what communities can do in response. French copy coming soon.
Download ReportSupporting Women & Gender-Diverse People who are Incarcerated or Recently Released from Prison
This resource was created to facilitate capacity building for WHAI’s community partners who work with women and gender-diverse people who are, or have been, incarcerated. It is intended as a starting place to strengthen this work, and foster inclusion of those who are / have been incarcerated. We encourage readers to continue to learn more about HIV, and how it impacts the lives people who are or have been incarcerated.
Download Tip Sheet
Know Your Rights – The Right to Access Violence Against Women Shelters for Women, Trans, and Gender-Diverse People Who Use Drugs
Download Poster
Know Your Rights – Encountering Family Policing Services in Violence Against Women Shelters
Download ReportHIV Prevention Medications: Fortune Teller Q&A
This foldable hand game features questions and answers from WHAI's HIV Prevention Medications pocketguide. Follow the instructions on the side to fold, play, and learn about PrEP, PEP and PIP!
DownloadTake Your Pick: HIV Prevention Options Posters
A series of three posters promoting the HIV prevention options PrEP, PEP and PIP. Links to WHAI's HIV Prevention Medications booklet.
Download Poster
Prevention in Principle and Gaps in Practice: Canadian Provider Attitudes Toward HIV Prevention Among Women
See Resource
Recording – Working with African, Caribbean, & Black Communities who use Substances
Watch Webinar
CAHR 2026: Centering women’s leadership to address inequities in HIV and STBBI prevention and care in Ontario
A summary poster of 'Centering women’s leadership to address inequities in HIV and STBBI prevention and care in Ontario: a community-engaged qualitative study with cis and trans women and nurses,' presented at the Canadian Conference for HIV/AIDS Research (CAHR 2026).
Download Poster
IFHP: A Gendered Impact
New Interim Federal Health Program (IFHP) Co-Pay Furthers Inequities for Women and Gender-Diverse People Living with, and at risk for, HIV and other Health Disparities.
Download Report
Women and Gender-Diverse People, HIV, HPV & Anal Cancer
While many women and gender-diverse people don’t worry about anal cancer, this is an important consideration, especially for those living with HIV. More cases of anal cancer are diagnosed amongst women than among men. HIV and Human Papillomavirus (HPV) are risk factors for anal cancer. This fact sheet is intended to raise awareness of anal cancer for women and gender-diverse people. Includes a second page with a blank form to input relevant resources for local distribution.
Download Factsheet
HIV Prevention Medications: PrEP, PEP & PIP
Women’s HIV risk is often unrecognized and overlooked, resulting in less awareness about HIV prevention options, especially surrounding HIV prevention medications. Awareness can be impacted by stigma, systemic barriers, and personal circumstances. This resource is intended for cis and Trans women to increase their awareness of the HIV prevention medications that are available to foster sexual health autonomy.
Download Booklet
Recording – Lunch & Learn – Women & Gender-Diverse People & HIV: Linkages to Care and Support
Watch Webinar
A Seat at the Picnic: Examining how social and structural determinants of health impact HIV risk and health outcomes.
The goal of this resource is to raise awareness about how social and structural determinants of health impact particular populations more than others and to support community organizations to build strategies to address these and work towards health equity. Using the picnic as a visual tool is meant to evoke feelings of collaboration and connection that come from planning and sharing a meal. Planning must be intentional and thoughtful to ensure the gathering runs smoothly. While social and structural determinants of health impact all aspects of health, we are focusing on HIV risk and health outcomes for this resource. Throughout WHAI work, we have drawn on creative measures for community capacity building.
Download Package
Transforming Care, Affirming Human Rights: Interdisciplinary Community-based and Intersectional Research to Advance HIV/STBBI Health Equity Among Trans and Gender Diverse People
Download ReportWebinar Recording – HIV and reproductive health: How to support pregnancy planning
Watch Webinar
Towards Access for All: Best and Promising Practices from Low-Barrier, Harm Reduction Shelters in Canada
Download Report
Characterizing Cis and Trans Women’s HIV Risk and Access to HIV Prophylaxis in Ontario, Canada
Read Article
5 Steps for Testing with GetaKit
GetaKit is a project and online platform that provides STBBI testing for people across Ontario, including HIV self-tests and laboratory-based testing for chlamydia, syphilis, gonorrhoea, hepatitis C, and HIV. This 5-step guide will walk you through the process of ordering from GetaKit, completing your tests, and obtaining your results.
Download Guide
How Bill 6 & 10 Impact Cis Women and Gender Diverse People Across Ontario
A report on how Bill 6: The Safer Municipalities Act and Bill 10:The Protect Ontario Through Safer Streets and Stronger Communities Act will impact cis women and gender-diverse people.
Download Report
HIV self-testing in cis women in Canada: The GetaKit study
In light of ongoing HIV diagnoses among cis women, despite decreases in other populations, such as men who have sex with men, various testing approaches, including HIV self-tests are being targeted at cis women as a means of identifying undiagnosed HIV infections and of linking those with positive test results to care. Little, however, is known about risk characteristics of cis women who access HIV self-tests in Canada. This study examines demographic characteristics, risk factors, and test results of cis women who obtained HIV self-tests through the HIV self-testing platform, GetaKit.ca.
Download Article
Know Your Rights: Drug Use and the Child Protection System in Toronto
This resource provides information about the child protection system in Toronto. Stigma and discrimination against parents who use substances — which is made worse by colonialism, racism, sexism, classism, homophobia, transphobia, other forms of discrimination, and poverty — affects the experience of people who use substances involved with the child protection system and makes it more difficult to access the resources and support they need. This resource provides legal information for parents who use substances that are involved with the child protection system in Toronto, their loved ones, and their service providers.
Download GuideAddressing rising syphilis rates among women in Canada
This webinar explores the rapid increase in syphilis cases among women in Canada over recent years, examining the social determinants of health, systemic barriers to care and intersecting forms of discrimination that drive the epidemic.
Watch WebinarAddressing the Impact: Raising HIV Awareness in ACB Communities
While ACB communities have made progress in reducing HIV rates, ongoing challenges such as racism, discrimination, and mistrust in the healthcare system can discourage individuals from seeking or continuing HIV prevention, treatment, and care services. Addressing these systemic barriers is essential for improving health outcomes and achieving equity.
Download BrochureDeclaration of Support for the Reproductive Rights of People Living with HIV Poster
A declaration poster for care providers and allies to people living with HIV, to recognize the reproductive rights of all people. Upholding these rights requires collaboration and support from across sectors.
Download PosterCanadian guidance should present formula and breast- or chestfeeding as equivalent options for parents with virally suppressed HIV
Canadian guidance still recommends formula feeding for all infants of birthing parents with HIV. However, evidence supports that the risk of perinatal HIV transmission from breast- or chestfeeding is very low (likely < 0.08%–16%) when a parent with HIV is on antiretroviral therapy (ART), virally suppressed, and under the care of a clinician.
Download ReportOHESI: HIV Diagnoses in Ontario – 2022
This 2022 report examines data that informs progress on targets and help us understand which populations are experiencing a disproportionate burden of HIV risk and infection.
Download Report
Sex Workers’ Experiences in Canada
An infographic summarizing the Sex Workers’ Action Program Hamilton (SWAP)'s goals, strategy and recommendations for improving the experiences of sex workers in Canada.
Download InfographicLiterature Review of Canadian Sex Workers’ Experiences with Police Interactions, Healthcare Access, and Social Exclusion
The Sex Workers’ Action Program Hamilton (SWAP) commissioned a literature review from the McMaster Research Shop to synthesize recent scholarly research relating to sex workers’ experiences with police, healthcare access, and social exclusion. This report details the findings from our review, which focused on studies published after the implementation of 2014 federal end-demand legislation (PCEPA).
Download Report
Know Your Rights: on drug laws for African, Caribbean, and Black (ACB) people who use drugs
ACCHO and the HIV Legal Network have released, Know Your Rights on Drug Laws for African, Caribbean and Black (ACB) people who use drugs. There are printed copies of the summary brochure in English, French, Swahili, and Arabic.
Download Brochures
I Support Harm Reduction in my Neighbourhood Poster
Download and print the "I Support Harm Reduction" poster for your lawn, window, work or neighbourhood. Artwork by Michael DeForge.
Download Poster
Virtual Lunch & Learn – Integrating Afrocentric Praxis in IPV and HIV Care for ACB Women
On September 25th 2024, WHAI hosted a Virtual Lunch & Learn that focused on a study led by Watetu Gichuki alongside Chris Leonard and Denise Johnson, examining the intersection of intimate partner violence (IPV) and HIV among African, Caribbean, and Black (ACB) women in the Greater Toronto Area (GTA).
Watch Video
Submission to the UN Committee on the Elimination of Discrimination Against Women
Read the Canadian Drug Policy Coalition & HIV Legal Network's Submission to the UN Committee on the Elimination of Discrimination against Women: Review of Canada at 89th Session from October 7th 2024.
Download Submission
Feeding Your Baby: A guide to infant feeding for people living with HIV
This booklet will walk you through some of the things you should know about feeding your baby and HIV. Reading this booklet, along with talking to a healthcare provider, can help you to make an informed decision.
Download Booklet
A Landscape of Community Change: WHAI’s response to the TRC’s Calls to Action and the Reclaiming Power & Place Report’s Calls for Justice
A Landscape of Community Change is a new WHAI resource created to strengthen WHAI's response to the Truth and Reconciliation Calls to Action and the Reclaiming Power & Place report's Calls for Justice. This resource includes a poster, booklet, and card deck which support the facilitation of discussions for individual and organizational anti-Indigenous racism work.
Download PackageCollective Action Community Change: A Report Amplifying Community Voices
This report is about the experiences of our priority populations from across Ontario. WHAI seeks to be informed by and amplify the experiences of those who face structural discrimination and exclusion, impacting HIV risk and the health outcomes of those living with HIV.
Download Report
International Overdose Awareness Day Poster – 2024
Our 2024 Overdose Awareness Day poster honours women’s role in harm reduction & saving lives in our communities.
Download Poster
CATIE’s Meno Poz & You
This booklet was designed for Women Living with HIV who are at any stage of the menopausal transition.
Download Booklet
Rupturing Anti-Black Racism: Planning & Facilitation Guide
This planning and facilitation guide for anti-Black racism (ABR) work builds on WHAI’s continuing efforts to meaningfully recognize and rupture white supremacist structures that impact our organizations and communities.
Download Booklet
Characterizing Cis and Trans Women’s Knowledge of HIV Risk and HIV Prophylaxis
This poster features a cross-sectional study coming from McMaster and York Universities that evaluated women’s objective HIV risk, the understanding of their own risk, and prophylaxis awareness and access.
Download PosterCreating Welcoming Spaces Poster
‘WELCOMING SPACES’ is a phrase referring to spaces that help connect people and create a sense of community. This poster (updated in 2024) is a supplement to the WHAI resource, "Women, HIV & Stigma: A Toolkit for Creating Welcoming Spaces."
Download Poster
Women, HIV & Stigma: A Toolkit for Creating Welcoming Spaces
WHAI's newly updated toolkit for practical tips, tools, and strategies to help community organizations build welcoming spaces.
Download Toolkit
Women-Centred HIV Care Hub Webinars
Watch the webinars created & hosted by the Women-Centred HIV Care Hub - a national, virtual network of people working to optimize the health of women and gender diverse people with HIV in Canada.
Watch WebinarsCanadian Conference on HIV/AIDS Research Amplifying Community Voices Poster
A summary poster of WHAI's Amplifying Community Voices report created for the Canadian Conference on HIV/AIDS Research.
Download PosterCanadian Conference on HIV/AIDS Research Collective Action Community Change Poster
A summary poster of WHAI's Collective Action Community Change report created for the Canadian Conference on HIV/AIDS Research.
Download Poster
National Survey Report: Holding & Untangling – Women and Gender Inclusive Overdose Prevention
This report shares findings from a national survey identifying and addressing access barriers and facilitators at supervised consumption sites and overdose prevention sites, led by people with lived experience.
Download Report
CHABAC: Promoting Black Sexual and Reproductive Health
The Canadian HIV/AIDS Black, African and Caribbean Network's “Promoting Black Sexual and Reproductive Health” project was aimed at increasing the capacity of Sexual and Reproductive Health (SRH) programs and services across Manitoba, Alberta, British Columbia, and Ontario to serve African, Caribbean and Black (ACB) communities, particularly women, 2SLGBTQI+ people, newcomers, and Black youth through healthcare provider (HCP) and community capacity building.
Visit Website
HIV Parenting Choices
People living with HIV can choose if and how to become a parent. Because of treatment options – including PrEP and PEP – and what we know about U=U, people living with HIV who want to become parents have many options. This website offers information and resources to support you in your choices.
Visit Website
St. Stephen’s Community House: Crystal Meth E-Learning Series
A series of five videos explaining how to respond to the growing crystal meth crisis for hospitals, primary care providers, shelters, drop-ins, justice system, and community based providers.
Watch Videos
Recording – Supporting Women Living with HIV Through Healthy Pregnancies and Infant-Feeding
On March 28th 2024, WHAI and CATIE hosted a panel discussion about supporting women living with HIV through healthy pregnancies and infant-feeding.
Watch WebinarLiving in the Asterisk(*): What does U=U mean for women?
WHAI's resource on what undetectable = untransmittable (U=U) means for women. This resource is intended to be used to support community conversations about women and HIV, and the U=U messaging.
Download Brochure
HIV in 2019: Who we’ve left behind
This discussion on The Big Story Podcast from August 22nd 2019 is mostly about women living with HIV including different realities they face, the extra barriers they have to get around, and the importance of having spaces where they can feel a sense of community.
Listen To The EpisodeShared Vision; Regional Action: Using Collective Impact to Strengthen Services for Women
A webinar about WHAI’s work to strengthen communities presented by Molly Bannerman, the Provincial Director of the Women and HIV/AIDS Initiative (WHAI) in Ontario.
Watch Webinar
HIV self-testing project: African, Caribbean and Black community approaches
This webinar explores the considerations and challenges that organizations and service providers have encountered, as well as approaches and solutions they’ve developed to facilitate the implementation of HIV self-testing in African, Caribbean and Black communities.
Watch Webinar
HIV Prevention Options for Cis and Trans Women
HIV Prevention Options for Cis and Trans Women Webinar facilitated by the OHTN and WHAI from November 29th 2023. featuring guest speakers Dr. Mia Biondi and Lauren Orser.
Watch Webinar
Love Positive Women & Black History Month Buttons – 2024
Print and make your own Love Positive Women & Black History Month buttons using WHAI's 2024 design.
Download Buttons
Growing Partnerships of Mutual Care: A Resource for WHAI Coordinators
A resource developed to provide guidance and support for WHAI coordinators in building meaningful partnerships to further their work.
Download Toolkit
HIV Strategy For Ontario to 2026: A Progress Report
Seven years into the HIV Strategy for Ontario to 2026 and faced with new targets, it’s time to reflect. Are we meeting our targets and achieving our goals? Is everyone with or at risk of HIV benefiting from the advances in HIV science? If not, who is being left behind and why?
Download Report
HIV Action Plan to 2030: Closing the gaps in the HIV care cascade in Ontario
HIV—the virus that has killed millions worldwide over the past four decades—is now preventable and treatable. The challenge? Getting HIV prevention and treatment to the people who need it, and ensuring no one is left behind.
Download Report
By The Numbers: What We’ve Learned
A booklet summarizing WHAI's 2021 / 2022 consultations conducted with women across Ontario who face systemic and structural risk factors related to HIV.
Download BookletOHESI: HIV Tests in Ontario – 2021 Report
The Ontario HIV Epidemiology and Surveillance Initiative reports on HV testing for the province, in order to monitor our testing programs and ensure HIV testing is accessible for those at risk of acquiring HIV. This report outlines key findings in HIV testing patterns for 2021.
Download Report
Effectiveness, uptake and delivery of non-occupational HIV post-exposure prophylaxis (PEP)
A Rapid Response report from the Ontario HIV Treatment Network outlining findings related the effectiveness of PEP.
Download Report
Awareness, accessibility and uptake of pre-exposure prophylaxis (PrEP) among cisgender and transgender women at risk of HIV infection
A Rapid Response report from the Ontario HIV Treatment Network outlining findings related the awareness of PEP among cis & Trans women.
Download Report
PrEP For Cisgender Women: A Guide for Health Care Providers
PrEP can be a reliable prevention tool for cisgender women at high risk of HIV. To improve uptake among women who could benefit, providers must make PrEP available and accessible.
Download Guide
TRANSforming JUSTICE: Trans Legal Needs Assessment Ontario
This report, as the first in a series, focuses on justiciable legal problems experienced by trans people who participated in the study.
Download ReportCanadian Pediatric & Perinatal HIV/AIDS Research Group Consensus Recommendations for Infant Feeding in the HIV Context
Read more about how providing comprehensive infant feeding guidance to families affected by HIV is complex issue requiring a multidisciplinary approach.
Download ReportOHTN Cohort Study: Women living with HIV are in need of adequate menopause care
Women Living with HIV experience earlier menopause than HIV-negative women. This poster explores the timing of menopause, quality of life, and connection to menopause/gynecological care among participants of the Ontario HIV Treatment Network Cohort Study (OCS).
Download Poster
The Facts about Women and Poverty in Canada
For women and gender-diverse people, poverty is caused by unique factors and leads to unique outcomes. Explore these factors & outcomes in this online fact sheet.
Visit Website
Beyond Survival: Helping Women Transition out of Poverty
This report is an analysis of the results of the Women’s Economic Development Collaborative Fund.
Download Report
Ontario Guidelines for Providers Offering HIV Testing
The Ontario Ministry of Health actively supports and promotes HIV testing to diagnose people infected with HIV as early as possible and link them to treatment, and identify people at high risk of acquiring HIV and connect them with prevention services.
Download Guide
A Collaborative Evaluation of the Women and HIV/AIDS Initiative’s Anti-Black Racism Work
This report evaluates WHAI's work from 2020 to 2022 in collaboration with Dr. Rai Reece, and in 2021 with added facilitation and co-creation support from Dr. Sarah Switzer.
Download ReportOHESI: HIV Diagnoses in Ontario – 2020
This 2020 report examines data that informs progress on targets and help us understand which populations are experiencing a disproportionate burden of HIV risk and infection.
Download Report
Women* & HIV in Ontario: An Introductory Toolkit
Our updated toolkit (2023) includes pull out sections on women & HIV in Ontario, populations of women disproportionately impacted, and strategies to build knowledge and capacity to support women in local communities. The tools include organizational and individual assessment tools, and an action planning for change tool, among others.
Download Toolkit
A Gender-Centred Dialogue on Alternative Justice Responses to HIV Non-Disclosure Criminalization
This report represents a synthesis of discussions during a 2022 roundtable about alternative justice responses to the criminalization of HIV non-disclosure in Canada, as well as findings from previous research and community engagement.
Download Report
Black Voices Locating Our Grief
This video resource was created by and for ACB community working in HIV and Harm Reduction, but it’s impact goes beyond these sectors. It’s an opportunity to acknowledge and name Black grief and reflect on it’s impact. The interactive activity is a powerful way to visualize the grief we carry, and start conversations with co-workers, friends, and community about the grief that comes from anti-Black racism.
Watch VideoReproductive Health and Parenthood Among Women Living with HIV in the Ontario HIV Treatment Network Cohort Study
Key findings, results, background and conclusions on reproductive health among women living with HIV from OHTN's Cohort Study.
Download Poster
Connecting: A Guide to Using Harm Reduction Supplies as Engagement Tools
This guide includes sections on safer injecting, safer inhaling, safer swallowing & snorting, overdoses, and additional resources.
Download Guide
The Perils of “Protection:” Sex Workers’ Experiences of Law Enforcement in Ontario
Over the past decade, the perception of sex workers has evolved in the eyes of policy-makers, law enforcement and the broader public from “criminals” to “victims” — but sex workers continue to be over-policed “for their own protection,” at considerable cost to their rights to work.
Download Report
Women and HIV: A Call for Allyship and a Reckoning
Dr. Mona Loutfy delivers the CAHR 2022 Mark Wainberg Lecture, "Women and HIV: A Call for Allyship and a Reckoning." This lecture focuses on Women & HIV and violence, inequity, and patriarchy especially as they relate to the experiences of women researchers and HIV research.
Watch Video
Prevalence of HIV Infection in the A/C Study
The A/C Study was a community-based research project conducted in Toronto and Ottawa from November 2018 to December 2019. One of the objectives of the A/C Study was to estimate the prevalence of HIV among ACB people in Toronto and Ottawa.
Download Factsheet
OHTN Virtual PrEP Action Toolkit
PrEP, or Pre-Exposure Prophylaxis, is a highly effective way for people at high risk to have more control over their sex lives and protect themselves from HIV. The OHTN has created a comprehensive online toolkit geared for those who are new to PrEP, those who are on PrEP already, and for clinicians.
Visit Website
HelloOntario: An HIV Resource for Newcomers
In Ontario, there is a system of HIV prevention, testing, care and support. There are many programs and resources to respond to HIV in the province. HelloOntario is a website that is here to help you get connected.
Visit Website
Caught in the Carceral Web: Anti-Trafficking Laws and Policies and Their Impact on Migrant Sex Workers
This report evaluates the combined impact of four areas of law on migrant sex workers: federal criminal laws targeting sex work and human trafficking; federal immigration laws regarding both inadmissibility as well as human trafficking; Ontario’s human trafficking laws; and municipal bylaws in Toronto regulating holistic health centres and body rub parlours.
Download Report
Social Determinants of Health: A Trans Health Perspective
An inforgraphic exploring the experiences of trans women living with HIV in Canada, findings from a national community-based participatory research project.
Download Fact Sheet
Mental Health & Psychological Wellbeing: Trans Women Living with HIV in Canada
Stigma around mental health still remains a reality in many communities and when combined with the layers of stigma around gender, as well as HIV status, trans women living with HIV face a unique set of challenges when navigating their life journey.
Download Fact Sheet
Black Experiences in Health Care Symposium Report
Building on the work accomplished at the Black Experiences in Health Care Symposium in 2017, the 2020 event renewed focus on engaging and informing health system partners and creating collaboration opportunities to advance Black health in Ontario.
Download Report
Women and HIV: A Disclosure Toolkit
This toolkit outlines information about HIV disclosure including privacy legislation, policies and guidelines for handling personal health information and the importance of these in building positive relationships with women living with HIV.
Download Toolkit
Changing Circumstances Surrounding Opioid-Related Deaths in Ontario during the COVID-19 Pandemic: Infographic
This infographic offers a summary of the corresponding report, Changing Circumstances Surrounding Opioid-Related Deaths in Ontario during the COVID-19 Pandemic.
Download Infographic
Changing Circumstances Surrounding Opioid-Related Deaths in Ontario during the COVID-19 Pandemic: Report
Given the rapidly changing nature of the pandemic and the continued rise in opioid-related deaths, a comprehensive understanding of the circumstances surrounding these deaths is needed to inform multifaceted public health interventions and policies that support people who use drugs to help prevent opioid-related mortality and reduce morbidity. This report updates the data provided in the preliminary report to include patterns up to the end of December 2020.
Download Report
Access to and Safety for Women at Supervised Consumption Services
This report delineates the challenges and opportunities for improving access to the services and contributes to existing research about the experiences and specific needs of WWUD. It also builds on CMHA’s recent policy work on the opioid poisoning crisis in Canada.
Download ReportLove Positive Women Printables – 2021
Some printable cards & posters to share with your community in February to honour Love Positive Women!
Download Printables
Indigenous Harm Reduction = Reducing the Harms of Colonialism
Indigenous peoples, languages, cultures, and traditions have not only survived colonization, they have been revived, reclaimed, and revitalized. This can be no more important than now, amid Canada’s on-going opioid and overdose crisis, in which Indigenous peoples are over-represented.
Download Report
Harm Reduction Satellite Sites: A Guide For Operating Harm Reduction Hubs From The Homes Of People Who Use Drugs
This program guide was developed based on the experiences at two Toronto-based community health centres developing Satellite site programming out of the homes of people who use drugs.
Download Guide
Caring for Women Living with HIV Toolkit – Webinar for Clinicians and Healthcare Providers
The second in a two part webinar series will provide an overview of the "Clinician’s Women-Centred HIV Care Toolkit" for clinicians to support its uptake and use by healthcare and service providers caring for women living with HIV.
Watch Webinar
Women-Centred HIV Care Toolkit – Webinar for Women Living with HIV and Community-Based Service Providers
This first in a two part webinar series provides an overview of the "Women-Centred HIV Care: Information for Women Toolkit" for women living with HIV to support its uptake and use as a self-health advocacy tool.
Watch Webinar
Caring for Women Living with HIV: Women-Centred HIV Care Toolkit
A team of HIV clinicians, researchers, advocates and women living with HIV, have worked with the Centre for Effective Practice (CEP) to develop two new clinical toolkits on Women-Centred HIV Care using an integrated knowledge translation approach. This toolkit is intended to support clinicians and community-based organizations in providing women-centred HIV care!
Download Toolkit
Women-Centred HIV Care: Information for Women Toolkit
A team of HIV clinicians, researchers, advocates and women living with HIV, have worked with the Centre for Effective Practice (CEP) to develop two new clinical toolkits on Women-Centred HIV Care using an integrated knowledge translation approach. This resource is for women living with HIV and can be used as a tool to support health self-advocacy and management.
Download Toolkit
Women Are Changemakers Poster
This poster evolved out of collaborative visioning that explores the question of how to creatively engage communities in ways that honour the experiences of women’s health and collectively create positive change.
Download Poster
Women-Centred Harm Reduction: Gendering the National Framework
This report explores gender-based harm reduction strategies, including an introduction of intersecting components of harm reduction and health determinants for women, highlights the key ways that elements interact to influence women's experiences, and provides examples of Canadian women-centred harm reduction programs.
Download Report
Negotiating Disclosure: The HIV Sero-Status Disclosure Toolkit
This toolkit is for organizations, service providers, and peers who would like to provide support to people living with HIV who are contemplating disclosure.
Download Toolkit
Love Positive Women Buttons – 2020
WHAI's Love Positive Women button templates available in 1, 1.5, and 3 inches.
Download Buttons
Women and Harm Reduction in Ontario: A Capacity Building Toolkit
WHAI's toolkit for strengthening the work harm reduction programs do with women who use drugs.
Download Toolkit
WHAI Trans Inclusion Pocket Guide
A WHAI resource for service providers to support the inclusion of Trans women in our work.
Download Guide
The Criminalization of HIV Non-Disclosure in Canada
This report focuses on the current status and need for change for the criminalization of HIV non-disclosure in Canada.
Download Report
Women Are Changemakers Booklet
This booklet summarizes the WHAI & 7.10 Stories Women project that creatively engaged communities in ways that honour the experiences of women’s health and collectively create positive change. Using a narrative based community engagement tool, WHAI Coordinators held multiple creative sessions creating space for women, service providers, and/or community partners to become artmakers and storytellers.
Download Booklet
Women in Prison, HIV and Hepatitis C
This report explores human rights for women experiencing incarceration in Canada.
Download Report
Reclaiming Power and Place: The Final Report of the National Inquiry into Missing and Murdered Indigenous Women and Girls
An executive summary report from the National Inquiry Into Missing and Murdered Indigenous Women and Girls.
Download Report
On Point: Recommendations for Prison-Based Needle and Syringe Programs in Canada
A report outlining the need and fulsome recommendations for a prison-based needle & syringe program (PNSP) in Canada, including successful international case studies, research, and key findings.
Download Report
HIV Stigma in African, Caribbean, and Black Communities
The CHABAC's fact sheet outlining HIV Stigma in African, Caribbean, and Black communities in Canada.
Download Fact Sheet
Brazen: Trans Women’s Safer Sex Guide
This 2017 edition of Brazen outlines comprehensive safe sex & health care practices and for Trans women.
Download Guide
HIV Treatment and an Undetectable Viral Load to Prevent HIV Transmission
CATIE's fact sheet answers frequently asked questions about HIV treatment and an undetectable viral load to prevent HIV transmission.
Download Fact Sheet
Know Your Rights: Guide for Parents Living with HIV
This resource was produced for parents or prospective parents living with HIV, including women, transgender men and non-binary people. Its aim is to provide practical information and to foster knowledge about some of the main areas of concern that parents living with or affected by HIV may have.
Download Guide
The Power of Undetectable: What you need to know about HIV treatment as prevention
This resource answers commonly asked questions about HIV treatment as prevention.
Download Booklet
Know Your Rights: Disclosure in School and Daycare
This brochure answers frequently asked questions about laws regarding HIV disclosure in school and daycare settings.
Download Brochure
Know Your Rights: Disclosure, Privacy, and Parenting
This brochure answers frequently asked questions about HIV disclosure & privacy when it comes to being a parent.
Download Brochure
Women Living with HIV and Intimate Partner Violence Q&A
This resource answers frequently asked questions for women who are living with HIV and who experience or are at risk of experiencing violence from their intimate partner.
Download Brochure
Indigenous Women, HIV, and Gender-Based Violence
This report focuses on the links between gender-based violence and HIV for Indigenous women and girls, and contains relevant recommendations for law reform.
Download Report
Love Positive Women Implementation Guide
WHAI's implementation guide for the Love Positive Women project that demonstrates love and care for women living with HIV.
Download Guide